Volume 4, Issue 5, October 2019, Page: 98-104
Total Assembly Construction Technology of Ultra-long Variable Cross-section Spiral Aluminum Plate Unit of Qingdao Citizen Fitness Center Sports Stadium
Yong Liang, China Construction Shenzhen Decoration Co Ltd, Shenzhen, China
Zhiyan Che, China Construction Shenzhen Decoration Co Ltd, Shenzhen, China
Xinyou Chen, China Construction Shenzhen Decoration Co Ltd, Shenzhen, China
Cipei Liu, China Construction Shenzhen Decoration Co Ltd, Shenzhen, China
Received: Aug. 2, 2019;       Accepted: Sep. 11, 2019;       Published: Sep. 25, 2019
DOI: 10.11648/j.eas.20190405.12      View  89      Downloads  7
Abstract
Qingdao Citizen Fitness Center Sports Stadium is saddle-shaped with a construction area of about 140,000m2. The rippled roof and façade are assembled with ultra-long variable cross-section spiral aluminum plate units. The largest aluminum plate unit is 1.5 tons heavy and 13 meters long. The main structure of this project is the steel structure that can deform due to the factors such as temperature and subsidence, thus making it difficult to accurately install the aluminum plate curtain wall. During construction, the total station is used several times for data acquisition to generate the BIM model, which is aligned, compared and analyzed with the theoretical 3D model for providing the accurate support for the construction process. A 1:1 main truss of the steel structure is erected on the façade to simulate the tire frame erection and assembly the ultra-long variable cross-section spiral aluminum plate units on site. The main steel structure, with the lowest point at 26 meters and the highest point at 49 meters, is lifted by the truck cranes and inserted for installation from up to down. This process is a new curtain wall construction method that increases the installation efficiency by 30%, improves the construction quality and guarantees the construction safety. It can provide the technical reference for the curtain wall work of other similar large sports stadium projects in the future.
Keywords
Variable Cross-Section Spiral Aluminum Plate, Ground Assembly, Overall Lifting, Setting-Out by Robotic Total Station
To cite this article
Yong Liang, Zhiyan Che, Xinyou Chen, Cipei Liu, Total Assembly Construction Technology of Ultra-long Variable Cross-section Spiral Aluminum Plate Unit of Qingdao Citizen Fitness Center Sports Stadium, Engineering and Applied Sciences. Vol. 4, No. 5, 2019, pp. 98-104. doi: 10.11648/j.eas.20190405.12
Copyright
Copyright © 2019 Authors retain the copyright of this article.
This article is an open access article distributed under the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/) which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Reference
[1]
Ministry of construction of the People's Republic of China, JGJ 80-2016 technical specification for safe operation at height during construction [S], China planning press, 2016.
[2]
Ministry of housing and urban-rural development of the People's Republic of China, jgj59-201 construction safety inspection standard [S]. Beijing: China building industry press, 2011.
[3]
Ministry of housing and urban-rural development of the People's Republic of China, gb50017-2003 steel structure design specification [S]. Beijing: China standard press, 2017.
[4]
General administration of quality supervision, inspection and quarantine of the People's Republic of China, TSG q5001-2009 regulations for the use of lifting machinery [S]. China standard publishing house, 2009.
[5]
Standardization Administration of China. GB/T 21086-2007 Curtain wall for building [S]. Qinhuangdao: Standards Press of China, 2008.
[6]
Ministry of Construction of the People’s Republic of China. JGJ 131-2001 Technical code for metal and stone curtain walls [S]. Beijing: Standards Press of China, 2001.
[7]
Ministry of Construction of the People’s Republic of China. JGJ 102-2003, J 208-2003 Technical code for glass curtain wall engineering [S]. Beijing: Standards Press of China, 2003.
[8]
Ministry of Housing and Urban-Rural Development of the People’s Republic of China. GB 50009-2012 Load code for the design of building structures [S]. Beijing: China Architecture & Building Press, 2012.
[9]
Ministry of Housing and Urban-Rural Development of the People’s Republic of China.. JGJ/T 104-2011 Specification for winter construction of building engineering [S]. Beijing: China Architecture & Building Press, 2011.
[10]
Liu pan, zhang jing. Application of BIM technology in curtain wall decoration engineering [J]. Shandong industrial technology, 2018, (11): 113, 101.
[11]
Ma guihong. Construction technology of variable section aluminum curtain wall for irregular construction single [J]. Construction technology, 2016.
[12]
Su Hang, Nie Jixing, Yu Pei, Huang Chao, Wan Hongwei. Construction technology of hyperboloid triangular concave-convex aluminum curtain wall [J]. Construction technology, 2015 (6).
[13]
Jiang Zhiqiang. On the Construction Technique of Special-shaped Curtain Walls in Large Buildings [J]. Decoration Refurbishment Chntre, 2015 (9).
[14]
Huang Jiawen. On the Application of BIM Parameterized Technique in the Special-shaped Curtain Walls [J]. Architectural Engineering Technology and Design, 2017 (14): 373-374.
[15]
Wen Changjuan and Ma Peng. Installation Technique of Curved Honeycomb Aluminum Plate Curtain Walls in Large Stadiums [J]. Sichuan Architecture, 2015 (12): 204-205.