Value Stream Mapping (VSM) is a tool for Lean Manufacturing which is used in mapping and identifying of all the specific actions required to eliminate the non-value activities manufacturing processes. Glides are essentially plastic components manufactured for supporting beds and sofas (legs). Due to globalisation and rapid advances in manufacturing technology, Small to Medium Enterprises (SMEs) involved in the manufacturing of Glides also need to move with the times and be able to adapt to new situations and VSM is the tool for that. This paper seeks to address the application of Value Stream Mapping to the production line for Glides with the aim of eliminating wastes and improving quality in the production of Glides. The current state map (CSM) was designed, analysed and suggestions were then given to improve the operational process while the future state map (FSM) was drawn for lean implementation.
Published in |
International Journal of Science, Technology and Society (Volume 3, Issue 2-2)
This article belongs to the Special Issue Design Innovations for Sustainable Development |
DOI | 10.11648/j.ijsts.s.2015030202.12 |
Page(s) | 6-10 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2015. Published by Science Publishing Group |
Value Stream Mapping, Lean Manufacturing
[1] | Rother, Mike; Shook, John (2003). Learning to See: value-stream mapping to create value and eliminate muda. Brookline, MA: Lean Enterprise Institute. ISBN 0-9667843-0-8. |
[2] | 2 Rother, Mike (2009). Toyota Kata. McGraw-Hill. ISBN 0-07-163523-8. |
[3] | http://en.wikipedia.org/wiki/Value_stream_mapping |
[4] | Tapping, D. and Shuker, T. (2003), Value Stream Management for the Lean Office, Productivity Press, New York, NY. |
[5] | R.J. Arbulu, I.D.Tommelein, K. D.Walsh, J. C. Hershauer (2003), Value streamanalysis of a re-engineered construction supply chain. Building Research & Information (2003) 31(2), 161–171 |
[6] | P Hines and N Rich. The seven value stream mapping tools. IJOPM 17,1 |
[7] | W.M. Goriwondo, S.Mhlanga, A. Marecha (2011) Use of the Value Stream Mapping tool for waste |
[8] | Reduction in manufacturing. Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 – 24, 2011 |
[9] | Chen,Meng L B.(2010) The Application of Value Stream Mapping Based Lean Production System. International Journal of Business and Management Vol. 5, No. 6; June 2010 |
APA Style
Maxwell Dzanya, Caroline Mukada. (2015). Value Stream Mapping in Glide Manufacturing: A Case Study of Insti-Tools in Zimbabwe. International Journal of Science, Technology and Society, 3(2-2), 6-10. https://doi.org/10.11648/j.ijsts.s.2015030202.12
ACS Style
Maxwell Dzanya; Caroline Mukada. Value Stream Mapping in Glide Manufacturing: A Case Study of Insti-Tools in Zimbabwe. Int. J. Sci. Technol. Soc. 2015, 3(2-2), 6-10. doi: 10.11648/j.ijsts.s.2015030202.12
@article{10.11648/j.ijsts.s.2015030202.12, author = {Maxwell Dzanya and Caroline Mukada}, title = {Value Stream Mapping in Glide Manufacturing: A Case Study of Insti-Tools in Zimbabwe}, journal = {International Journal of Science, Technology and Society}, volume = {3}, number = {2-2}, pages = {6-10}, doi = {10.11648/j.ijsts.s.2015030202.12}, url = {https://doi.org/10.11648/j.ijsts.s.2015030202.12}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ijsts.s.2015030202.12}, abstract = {Value Stream Mapping (VSM) is a tool for Lean Manufacturing which is used in mapping and identifying of all the specific actions required to eliminate the non-value activities manufacturing processes. Glides are essentially plastic components manufactured for supporting beds and sofas (legs). Due to globalisation and rapid advances in manufacturing technology, Small to Medium Enterprises (SMEs) involved in the manufacturing of Glides also need to move with the times and be able to adapt to new situations and VSM is the tool for that. This paper seeks to address the application of Value Stream Mapping to the production line for Glides with the aim of eliminating wastes and improving quality in the production of Glides. The current state map (CSM) was designed, analysed and suggestions were then given to improve the operational process while the future state map (FSM) was drawn for lean implementation.}, year = {2015} }
TY - JOUR T1 - Value Stream Mapping in Glide Manufacturing: A Case Study of Insti-Tools in Zimbabwe AU - Maxwell Dzanya AU - Caroline Mukada Y1 - 2015/02/27 PY - 2015 N1 - https://doi.org/10.11648/j.ijsts.s.2015030202.12 DO - 10.11648/j.ijsts.s.2015030202.12 T2 - International Journal of Science, Technology and Society JF - International Journal of Science, Technology and Society JO - International Journal of Science, Technology and Society SP - 6 EP - 10 PB - Science Publishing Group SN - 2330-7420 UR - https://doi.org/10.11648/j.ijsts.s.2015030202.12 AB - Value Stream Mapping (VSM) is a tool for Lean Manufacturing which is used in mapping and identifying of all the specific actions required to eliminate the non-value activities manufacturing processes. Glides are essentially plastic components manufactured for supporting beds and sofas (legs). Due to globalisation and rapid advances in manufacturing technology, Small to Medium Enterprises (SMEs) involved in the manufacturing of Glides also need to move with the times and be able to adapt to new situations and VSM is the tool for that. This paper seeks to address the application of Value Stream Mapping to the production line for Glides with the aim of eliminating wastes and improving quality in the production of Glides. The current state map (CSM) was designed, analysed and suggestions were then given to improve the operational process while the future state map (FSM) was drawn for lean implementation. VL - 3 IS - 2-2 ER -